Vandezande > Projects > WWTP 's Hertogenbosch

Product
Scraper Bridges
Water treatment

Locatie
's Hertogenbosch (Pays Bas)

Design and build project

Vandezande has fitted the 2 pre-sedimentation tanks with diametral scraper bridges, each with a length of 52 metres and equipped with a support structure for a swivelling tarpaulin covering.  In addition, the 6 most-sedimentation tanks were also fitted with scraper bridges with a length of 30 metres.

  • infrastructure
  • environmentally friendly


Kilowatt

56 230