Design and build project
Vandezande has fitted the 2 pre-sedimentation tanks with diametral scraper bridges, each with a length of 52 metres and equipped with a support structure for a swivelling tarpaulin covering. In addition, the 6 most-sedimentation tanks were also fitted with scraper bridges with a length of 30 metres.