The Vandezande and Vameco team replaced and exchanged the hydraulic cylinders that realise the rotational movement of the bridge. Two new cylinders, pre-assembled in a completely new cardanic suspension and provided with a new point of engagement, were exchanged on-site in a very short period of time.
It is thanks to the expertise, experience and multidisciplinary cooperation of Vandezande and Vameco that this work could be successfully completed.
A refined design by our engineering office, high-quality manufacturing in our workshops, meticulous preparation of the assembly work by our project leaders and safe execution on site by our technicians are the keys to the success of such a complex project.