Vandezande > Projects > Weir-lock complex Harelbeke

Product
Water treatment
Hydropower Screws
Screw Pumps and Hydropower Screws
Mechanics on waterways

Locatie
Harelbeke (België)

Design and build Project

Elektromechanical equipment for the weir and the lock at the Harelbek lock complex.  The hydraulic part wast manufactured by Vameco.

Two hybrid screw pumps/hydropower screws to pump back the locking losses, on the one hand, and to generate green energy in the event of an excess of water, on the other hand, in order to obtain an energy-neutral operation of the weir-lock complex.

  • 220 Kwh
  • infrastructure
  • environmentally friendly
  • fish-friendly


Kilowatt

56 230